
Cost per finished film, not price per clip
What a Filmsquare credit is, why a model costs the same credits on every plan, and why a price per second does not tell you what a film costs.
Every AI video tool has a price per second. It is a useful number. It is also the wrong one to plan a film on.
A price per second tells you what one take costs. A film is not one take. It is every take you made on the way to the ones you kept, at whatever quality you made them. That is the number we compete on: cost per finished film.
What a credit is #
You pay for takes in credits. Every model has one credit price per second or per still, and it is the same on every plan. What a credit costs in euros depends on what you commit to: €0.05 pay as you go, less on a plan.
| Take on Seedance 2.5 | Pay as you go |
|---|---|
| A 6-second draft, 480p | 22.70 credits · €1.14 |
| A 6-second final, 1080p | 125.55 credits · €6.28 |
Credits always stand next to euros. The Generate button carries its estimate, the Render finals dialog shows the estimated cost before anything starts, and each take shows what it cost afterwards.
Why price per second misleads #
Take the two numbers above. Per second, Seedance 2.5 costs 3.78 credits · €0.19 as a draft and 20.92 credits · €1.05 as a final. Neither number tells you what a shot will cost you, because neither says how many takes it took.
Here is the arithmetic for one 6-second shot. Suppose it takes three tries before the shot is right. Not a measured figure, just an example to run the numbers on.
Three tries, all at final quality. 3 × 125.55 = 376.65 credits · €18.83.
Three tries as drafts, then one final. 3 × 22.70 + 125.55 = 193.65 credits · €9.68.
Same shot, same model, same number of tries. The difference is where the tries happened. (The euros here are the credit totals × €0.05, rounded to the cent.)
Multiply that across every shot in a scene and every scene in an episode, and the price per second stops mattering much. What matters is how many of your tries happen at final quality. In Filmsquare, the answer is meant to be one per shot: finals render once the animatic and the locked departments are signed off, and they render from the draft you already picked.
The cheapest model is not always the cheapest #
The same logic decides which model a take goes to. Unless you pick one yourself, Filmsquare routes a take to the capable model with the lowest expected cost per accepted take: its price, divided by how often its takes get picked, made final or signed off in review.
A cheap model whose takes rarely survive review costs more per kept shot than a dearer one that gets it right. Until there is enough of that data in a workspace, the cheapest capable model wins. A model you choose yourself always wins.
What costs nothing #
Some of the work in a production never touches a model we pay for:
- Reading a script into scenes and shots with the Fountain reader.
- Comments, sign-offs, the shot list and the cut.
- Everything your own Claude does over MCP: breakdowns, feedback, continuity checks. It runs on your own Claude subscription.
Crew fees agreed in a brief are recorded on the assignment. They are not taken from your credits.
Seats and plans #
A plan lowers what a credit costs: the more you commit, the less each credit costs, and a model costs the same credits on every plan. Only the roles that make takes need a seat. Reviewers and viewers are free. Plan credits are for their month, and credits you buy in a pack are valid 90 days.
The Free plan lets you explore every step with one production and no credits. To generate, buy a pack or take a plan. The prices are on the pricing page.
The number to watch #
When you plan a film, ask what the finished minutes cost, not what a second costs. On Filmsquare you can read it off the production: the Credits & plan page shows the credits used per department and per production, and a ledger with every spend at the exact amount.
Read more #
- Credits and what things cost, every model price and where you see it.
- Plans, credits and packs, the plans, seats and packs in full.
- Approve cheap. Render once., the gate in front of the finals.

Next post
Work with your own Claude