What happens when I run out of credits?
A take that needs more credits than you have free to spend is refused before anything is sent to a model, so nothing is charged for it. Nothing that already rendered is lost. Add credits and run the take again.
What you see #
The app says "Not enough credits", with what the take needs and how many are left, and ends with Add credits, which opens Billing. The error behind it is 402 out_of_credits.
What is free to spend #
Your balance minus everything still rendering. A take in progress holds its estimate until it is done, so several takes at once can use up what is free before the last one starts. The actual cost can differ slightly from the estimate.
What to do #
- Open Billing with Add credits.
- Buy a pack with Buy, or ask an owner to. Only an owner buys packs and changes the plan.
- On Studio or Production, an owner can also add seats, which add their plan credits for the rest of the period.
- Run the take again.

What still works at zero #
Reading a script into scenes and shots, comments, sign-offs, the shot list and the cut cost no credits. Neither does what your own Claude does over MCP.
Storage can use credits too #
Storage above what your plan includes costs credits each month. If your balance does not cover the charge, it can go below zero, and new generations wait until credits are added.
See how credits work for what takes cost, and buy more credits.