Filmsquare HelpDocs

Plans and credits

How do credits work and what does a shot cost?

Updated .md

On this page
  1. What a credit costs
  2. What models cost
  3. What a shot costs
  4. Where you see the price
  5. What if you do not have enough
  6. Which credits go first
  7. What costs nothing

You pay for takes in credits, a prepaid unit with no cash value. Every model has one credit price per second or per image, the same on every plan, and Filmsquare always shows the euros next to the credits. Euros are excluding VAT.

What a credit costs #

Without a plan one credit is €0.05. On a plan it costs less: see how plans work.

What models cost #

Per unit, with the euros at pay as you go:

ModelWhatPerPrice
Seedance 2.5Draft video, 480psecond3.78 credits · €0.19
Seedance 2.5Final video, 1080psecond20.92 credits · €1.05
Seedance 2.0 FastDraft video, 480psecond2.07 credits · €0.10
Kling 3.0 ProDraft or final video, with soundsecond6.18 credits · €0.31
Seedream 5.0 ProStill, up to 1.5Kimage1.66 credits · €0.08
Nano Banana 2Still, 1Kimage2.47 credits · €0.12
ElevenLabs v4Voice, about a minute1,000 characters2.94 credits · €0.15

The Model menu lists only the models that are switched on.

What a shot costs #

TakeCreditsPay as you go
A 6-second draft, Seedance 2.522.70€1.14
A 6-second final, Seedance 2.5125.55€6.28

Where you see the price #

  • Before you start: the Generate button carries the estimate, for example "1 cr · €0.05". Estimates round up to whole credits.
  • Before the finals: the Render finals dialog shows the shots that will render, the Estimated cost, the model and what You have.
  • Afterwards: each take shows its cost. Billing shows the credits used this month per department and per production, and a ledger of every grant, spend and purchase.
  • Always: the credits meter at the bottom of the sidebar. When it says Running low, it offers the smallest pack that covers this month's use.
The Billing page with credits used by department, spend by production and the ledger (open the full screenshot)
Fig. 1 The Billing page with credits used by department, spend by production and the ledger

What if you do not have enough #

A take in progress holds its estimate. What is free to spend is your balance minus everything still rendering. A take that needs more than that is refused before anything is sent to a model. The actual cost can differ slightly from the estimate. If a generation fails on the provider's side, no credits are charged for it, or they are credited back.

Which credits go first #

Plan credits are spent first, then the credits that expire first. Plan credits are for their month. Credits from a pack are valid 90 days; packs bought before 10 November 2026 do not expire.

What costs nothing #

Reading a script into scenes and shots, comments, sign-offs, the shot list and the cut cost no credits. Neither does what your own Claude does over MCP, such as breakdowns and continuity checks: that runs on your own Claude subscription.

The docs explain how the model is chosen when you do not pick one.

Email us