Why does a department say "Changed after sign-off"?
A sign-off belongs to the version the signer looked at. When the work under it changes, the department reads Changed after sign-off, and so does every department that depends on it. Nothing is lost: the old sign-off stays on record, but it no longer counts.

What changed #
The step says in one line what came in after the sign-off. The department is the first column.
| Department | What makes it stale |
|---|---|
| Writing | A new script revision ("Script v4 came in after the sign-off.") |
| Casting, Wardrobe | A new version of a cast member, in every episode that uses it (Voices too, when the production has it) |
| Sets, Props | A new version of a set or a prop, in every episode that uses it |
| Animatic | A picked still, a picked dialogue, sound or music take, or a changed shot length |
| Draft | A new draft video picked |
| Final | A picked still, sound or music take, draft or final video |
| Voices, Sound, Music | A picked dialogue, sound effect or music take, when the production has the department |
| Edit | Any pick, a trim or a new order in the cut, when the production has an Edit department |
A new script revision also reopens Breakdown and everything after it.
What to do #
- Open the department that says Changed after sign-off and read the line under its name.
- Look at the new work.
- Choose Ask for sign-off and say in the note what changed. Signers see it under Waiting for you on Home.
- The signers choose Sign off for that department. Departments that depend on it need the same.
If you were signing when it changed #
If the work changed while a signer had the step open, the app loads the new work first and says, for example, "A new draft was picked since you opened this. Have a look, then sign off." Nothing was signed off. Look at the new work and choose Sign off again.
The full list is in when a sign-off goes stale.